Syncrudepipe2017 CAC was the final receiver, through a third-party staging yard, of most of Syncrude’s ongoing pipe replacement in late 2017.


 NexenLongLk2016 CAC received all scrap accumulated at Nexen Long Lake in 2016.


Port Mann Bridge scrap metal  CAC was granted sole receiver status of scrap metal generated from the deconstruction of the Port Mann bridge in Surrey, BC – that province’s largest scrap project in that year.


 MSL yard (4)  Receiving a majority of scrap from an abandoned $5 billion project – Alberta’s largest scrap project in that year, at over 30,000 tonnes.


This is a caption Received coiled pipe spools for demolition.  Using its proprietary equipment and techniques, CAC was able to recover the spools.